Description
Physical and chemical tests are conducted to determine the quality of the cement to ensure its suitability for use.
Responsible Entity
Responsible Entity Information
Address Erbil Construction Laboratory Directorate
Office Hours
(8:30) a.m. to (2:00) p.m.
Erbil Construction Laboratory Directorate
Erbil / Ankawa Road / Opposite Abu Afif Sweets
Email:- info@erbilcl.com
nazar@erbilcl.com
Email:- info@erbilcl.com
nazar@erbilcl.com
0662444850(964+)
Duhok Construction Laboratory Directorate
Duhok / Reza Neighborhood / Duhok ganjina Road
Email :- info@duhokcl.org
Email :- info@duhokcl.org
07504501824
Sulaimani Construction Laboratory Directorate
Sulaimani / Industrial Zone 1 opposite Darwaza City and Aubara neighborhood
Email:- lab_sul@yahoo.com
info@sulicl.com
Email:- lab_sul@yahoo.com
info@sulicl.com
07705484151
Koya Construction Laboratory Directorate
Koya / Auni Street Next to Koya Justice Office Opposite Kani Girls School
Email:- koyaclaboratory@yahoo.com
Email:- koyaclaboratory@yahoo.com
Garmian Construction Laboratory Directorate
Garmian / Kalar / Shira Naqib Square
Email:- nabardmageed@yahoo.com
Email:- nabardmageed@yahoo.com
07701361313 - 07719927596
Zakho Construction Laboratory Directorate
Zakho / General Road – Ibrahim Khalil
Email :- labzakho7@gmail.com
Email :- labzakho7@gmail.com
07504661763
Halabja Construction Laboratory Directorate
Halabja – Industrial Zone – Behind Halabja International Stadium
Email :- labhalabja@yahoo.com
Email :- labhalabja@yahoo.com
07728656940- 07501770792
Soran Construction Laboratory Directorate
Soran Edge Castle
Email :- soranclab@gmail.com
Email :- soranclab@gmail.com
07512103223
Raperin Construction Laboratory Directorate
Ranya Next to Raperin Road Repair and Protection Directorate or next to Raperin Administration
Email:- labranya@yahoo.com
Email:- labranya@yahoo.com
07701544865- 07501011511
Conditions
The party requesting the test promises to bear all the costs of the tests according to the laboratory instructions.
Construction laboratories promise to perform the necessary tests on the samples submitted by the applicant.
The construction laboratory shall keep the samples as long as it deems necessary, while if the requester requests the return of the samples (for materials that are not damaged and remain intact), he/she must visit the laboratory within 10 days Otherwise, the right to the results of the tests it disappears.
The laboratory is obliged to take appropriate measures to preserve the samples throughout their stay.
In the event of damage or breakage of the samples prior to testing, the party requesting the testing is obliged to provide “replacement samples” similar to the basic samples. If it cannot be provided, a “replacement inspection” must be carried out (if possible), subject to new costs and mutual agreement.
Documents
Bring a letter from where they are requesting an inspection (required).
The arrival of the Superintending Engineer or his representative to bring the materials, to ensure that the materials are not changed by the Contractor.
Quantity of materials required for inspection (features).
Time
(12) Twelve days, if ordinary cement. (35) Thirty-five days, if cement is the type of material.
Price
According to the letter of the Ministry of Reconstruction and Housing No. (5855) on 30/9/2015 supported by the letter of the Ministry of Finance and Economy / General Directorate of Budget / Revenues and Expenditures No. (7374) on 31/8/2015:
(364,250) three hundred and sixty-four thousand two hundred and fifty dinars.
(364,250) three hundred and sixty-four thousand two hundred and fifty dinars.
Procedures
First, the client visits the Construction Laboratory Directorate according to its geographical boundaries, in order to submit the documents and the materials to be tested.
Visit the sampling room, in order to hand over the sample to the laboratory.
Visit the Art Room, in order to obtain the approval of the Art Director on the requested letter to ensure the authenticity.
Signature of sample collection and sending to the relevant department.
Signature of Inspection and Reporting Officer to make the inspection report truthfully and accurately.
Signature of the Head of the concerned department for making the inspection report truthfully and accurately.
Signature of the Art Office, for verification of report to be signed by the Director.
Signature of the laboratory director to approve the results.
Retrieving the Inspection Report In the Reports section to retrieve the sample inspection results.
Application Form
Legal Documantation
External Services
پێویستە خزمەتە پەیوەندیدارەکان دەستنیشان بکرێن، ئەگەر هەبن.
Signed by
پێویستە ئەم خزمەتە لەلایەن بەڕێزان وەزیر/سەرۆکی دەستە و بەڕێوبەری گشتی دیوان و لیژنەی خزمەت واژوو بکرێت.
Service ID
MOCH-06
Last updated
08-11-2022
If you have a complaint about this service, please let us know.
File a complaint:
Citizen Complaint System